The project planning and programming software "IndraWorks Engineering"
has to be installed in the system variant IndraWorks ML* on the project
planning PC.
6. Create an IndraWorks project.
Refer to chapter 12.10.1 "Creating the control" on page 63.
7. Load the system firmware via IndraWorks.
Load the system firmware to the "IndraControl VPB" device via the
Engineering Suite "IndraWorks Engineering".
Refer to chapter 12.10.2 "Firmware download" on page 69.
Control malfunctions due to control switch-off
during initialization
Note that hardware is initialized after the system firmware installation and the
subsequent reboot. Wait till completion. Do not switch off the control. This
procedure has to be completed. Subsequently, continue the commissioning.
11.2 Software tools
11.2.1 Standard software tools
For the descriptions of the standard software tools for the industrial PC
IndraControl VPB, refer to the project planning manual "IndraControl V-Devices
Operating Systems" (refer to chapter 1.4 "Related documents" on page 2). The
following software tools and functions are for example described in this project
planning manual:
● Settings for dual monitor operation
● Data backup using the "Acronis" backup and recovery software
● Software for UPS monitoring
● Software for touch calibration and SMART analysis
● Simulation of the right mouse key
● Hardware event monitoring with response trigger
● Auto login
● M-key UpperClass filter for downwards compatibility of the M-key codes
● Windows 7 Multi-user interface
● Enhanced write filter
● File-based write filter
11.2.2 System-specific software tools
For the descriptions of the system-specific software tools, refer to
Bosch Rexroth AG
Commissioning
IndraControl VPB 40.4
40/87
DOK-MLC***-INDRACTRLV4-IT02-EN-P