● Check the proper function of the holding brake.
● Ensure that the motor and all participating components of the drive are un-
damaged.
● Ensure that keys are protected against ejection.
Commissioning
For start up procedure refer to the project planning manual and the respective
documentation about drive controller or firmware description.
Observe the general safety noteschapter 2.6 "Product- and technology-depend-
ent safety instructions " on page 5.
7.2 Operation
During operation, keep the ambient and operation conditions and technical data
specified in the project planning manual.
Checks during operation:
● Pay attention to exceptional noise.
● Pay attention to increased vibrations.
● Check the motors and fan units for cleanliness.
● Check the tightness of the coolant connections.
● Check the monitoring devices and diagnostic / error messages of the control-
lers.
Decommission the drive when deviations from normal operation exist. For fur-
ther procedure refer to chapter 11 "Troubleshooting " on page 93.
84/101
Commissioning and operation
MS2N Synchronous Servomotors
Bosch Rexroth AG R911347581_Edition 04