EasyManua.ls Logo

Brother BAS-340 - Page 26

Brother BAS-340
93 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
~
Upper shaft
mechanism
(2)
O.Smm
Marker line
-23-
3)
Align
the
thread
take-up crank
Q)
with
the
tapered
bore
of
the
upper shaft 0 and attach it
with its screw@ and
set
screw@.
4)
Adjust
the
upper shaft 0 with
the
thread
take-
up crank
Q)
and
the
set collar 6 so
that
there
is
no end play
and
check
that
the
upper shaft 0
lightly rotates. Then check
the
screw flat and
tighten
the
screw
of
the
set
collar
6.
5)
Adjust
the
intermittent presser cam 0
and
bobbin winder pulley 0 so
that
there
is
0.5
mm
space
between
them,
then
tighten
the
set
screw
of
the
bobbin winder pulley
0.
6)
Align
thethread
trimmer cam @ with
the
screw
flat
of
the
upper shaft
0,
then
tighten
the
set
screw.
7)
Align
the
crank rod assembly
CD
on
the
marker
line
and
attach
the
crank rod assembly
CD
to
the
upper shaft 0 with
the
screw.
From the library of: Superior Sewing Machine & Supply LLC

Table of Contents

Other manuals for Brother BAS-340

Related product manuals