How frequently should
the circul. pump be
switched on per hour?
Once for 3 minutes,
twice for 3 minutes,
3 times for 3 minutes,
4 times for 3 minutes,
5 times for 3 minutes,
6 times for 3 minutes,
permanent operation
1)
Switch on circ. pump Graphical display of number of
times the pump is switched on per
hour.
1)
Do you wish to change
the circulation switch-
ing program?
Yes, No Selecting Yes takes you to the
switching program for hot water
circulation.
1)
Thermal disinfection
1)
Should a thermal disin-
fection be carried out?
Yes, No
1)
What temperature
should be used for ther-
mal disinfection?
1)
70°C
60°C to 80°C
At temperatures above 60°C there
is a risk of scalding at the taps dur-
ing and after thermal disinfection.
1)
On which day should the
thermal disinfection be
performed?
1)
Monday, Tuesday,
Wednesday, Thursday, Fri-
day, Saturday, Sunday, daily
1)
At what time of day
should the th. disinfec-
tion be performed?
1)
1:00h
0:00 to 23:00h
Times entered must be whole
hours only (no minutes).
1)
Should the LED of the sin-
gle charge key be acti-
vated?
Yes, No The single charge function (for
one-off heating of hot water) still
works but is no longer indicated by
an LED.
1)
1) Not possible or not available for boilers with UBA1.x and DBA.