46
EN
7.3 Preparing the brine
● Check that the unit has been properly installed.
● Remove cover (4).
● Pourregenerative(salttabletsaccordingto
DINEN973typeA)intothestoragearea(5).
● Fill the brine cavity (6)withapprox.15litresof
drinking water.
NOTE
If the consumption of a large quantity of
softened water is expected following start-up,
please note: The multi-target lter requires
approx. 3 hours for the brine to form.
6
4
5
StArt
4450 L
● Connect the mains plug when the water
supply is closed.
The display shows StArt and then alternates
between the remaining lter medium capacity
andthedayoftheweek(1to7)withthetime.
6 10:50
Therstregenerationstartsautomatically,runs
for approx. 40 seconds and can be cancelled if
necessary by holding down the OK button (for
4seconds).
Following regeneration, initiate the start-up
ushing:
● Open the water supply line.
● Hold down the Change mode button until Ibn
appears on the display.
Ibn
Flushingrunsfor1minute(ushtimet1).The
valve then moves to the operating position.
The unit is ready for use.
The capacity is preset.