52
EN
9.3 Inspection
(Carried out by the operator in accordance with EN 806-5)
Inspection task Interval Note for products
WITHOUT active
BWT DES* regis-
tration
Note for products
WITH active
BWT DES* regis-
tration
Check/rellregenerative According to use Required Required
Check brine containers for soiling Every 2 months Required Required
Check for leaks, visual inspection Every 2 months Required Required
Functional test/control unit display Every 2 months Required
Not
required
Test regenerative consumption
depending on the treated water
Every 2 months Required
Not
required
Check the setting of the regeneration
waste water system
Every 2 months Required Required
Check the counting function of the
water meter
Every 2 months Required
Not
required
Test the regeneration process Every 2 months Required
Not
required
Clean the brine container and the
internal surfaces that come into contact
with water
Every 6 months Required Required
* DES = Digital Eco System