EasyManua.ls Logo

BWT Bewamat COMB 1 - Inspection

BWT Bewamat COMB 1
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
52
EN
9.3 Inspection
(Carried out by the operator in accordance with EN 806-5)
Inspection task Interval Note for products
WITHOUT active
BWT DES* regis-
tration
Note for products
WITH active
BWT DES* regis-
tration
Check/rellregenerative According to use Required Required
Check brine containers for soiling Every 2 months Required Required
Check for leaks, visual inspection Every 2 months Required Required
Functional test/control unit display Every 2 months Required
Not
required
Test regenerative consumption
depending on the treated water
Every 2 months Required
Not
required
Check the setting of the regeneration
waste water system
Every 2 months Required Required
Check the counting function of the
water meter
Every 2 months Required
Not
required
Test the regeneration process Every 2 months Required
Not
required
Clean the brine container and the
internal surfaces that come into contact
with water
Every 6 months Required Required
* DES = Digital Eco System

Table of Contents

Related product manuals