EasyManua.ls Logo

BWT Bewamat COMB 1 - Maintenance in Accordance with en; Replacement of Parts

BWT Bewamat COMB 1
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
53
53
EN
9.4 Maintenance in accordance with
EN 806-5
(Carried out by BWT after-sales service or
an authorised technician in accordance with
EN 806-5)
In addition to all inspection activities, maintenance
work on the assemblies listed below is required
every 6 months by BWT after-sales service or a
specialist trained by BWT. A detailed maintenance
manualcanberequestedfromthequaliedtterat
BWT. We recommend that you enter into a mainte-
nance agreement with the BWT after-sales service
departmentoryourtter.
Assembly (the assemblies exist or do not exist
depending on the type and design of a BWT
product)
Cleaning and possibly sanitisation
1.1 Entire hydraulic unit
1.2 End shield
1.3 Gears
1.4 Drive motor
1.5 Control piston
1.6 Red/green injector
1.7 Electrolysis cell
1.8 Locking pin
1.9 Waste water elbow
JG hoses
2.1 Blending
2.2 Water meter cover
2.3 Paddle-wheel
2.4 Guideba󰀪e
2.5 Check valve
2.6 Bypass valve
2.7 Filler plug
3.1 Brine meter
3.2 Brine meter solenoid valve
5.1 Sieve base
5.2 Low salt gauge
5.3 Brine level switch
6.1 AQAStopoorsensor
6.2 AQA test
9.5 Replacement of parts
The operator must ensure that parts that are subject
to wear and ageing during the life of the product are
replacedbyaqualiedtter.
Details of the replacement cycles can be found in
the maintenance manual from BWT.

Table of Contents

Related product manuals