47
47
EN
8 Operation
8.1 Handing over the unit to the
operator
If there is a delay between the installation/start-up
of the unit and transfer to the operator, a manual
regeneration must be performed.
The operator must be told how the unit works as
well as how to operate and inspect it. Ensure that
the operator receives the installation and operating
manual.
8.2 Setting the supply of softened
water
The unit is preset to the following values:
Inowwaterhardness=20°dH
Blended water hardness = 0°dH
The supply of softened water must be readjusted
in the following cases:
– The capacity of the product has been changed.
–Thereisadierentinowwaterhardness.
– Blended water hardness has to be changed.
Calculating the supply of softened water:
E – V
Supply of sof-
tened water
in litres
=
K x 1000
E = Inowwaterhardnessin°dH
V = Set blended water hardness in °dH
K For Bewamat COMB 1 = 50 m
3
x °dH
K ForBewamatPRO1 = 42.5 m
3
x °dH