EasyManuals Logo
Home>CEM>Laboratory Equipment>EDGE system

CEM EDGE system User Manual

CEM EDGE system
72 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #47 background imageLoading...
Page #47 background image
43Calibrations
4. Select Pressure “Calibrate.” This will take less than a minute.
5. Select “OK.
Verify Autosampler Calibration
The autosampler requires calibration verication during the initial install, if the EDGE system is moved, and semi-
annually.
1. Select the System Menu icon in the bottom right corner of the screen.
2. Select Tools.
3. Scroll down to the bottom of the page to the Autosampler section.
CAUTION
When verifying the autosampler calibration, always select “Load,” “Collect”, and “Unload” in that order
without skipping a function.
4. Place a Q-Cup and collection vial in position 4 of the rack.
NOTE
Position 4 is used to verify the calibration. Moving the Q-Cup to and from this location veries the
interpolation of the calibration positions and is therefore the best test for the calibration.
5. Select “1” from Sample Position to display the sample position menu, and select position 4.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the CEM EDGE system and is the answer not in the manual?

CEM EDGE system Specifications

General IconGeneral
BrandCEM
ModelEDGE system
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals