Figure 132: Clearances Required for the Cisco Nexus 7004 in a Four-Post Rack with Front-Mount Brackets
Chassis width10Chassis1
Right side clearance recommended for cabinet
installations:
Use 11 inches (27.9 cm).
11Cable management frames2
Right side clearance recommended for open rack
installations:
If next to another open rack, use 6 inches
(15.2 cm) between racks.
If next to a wall, use 11 inches (27.9 cm)
between the chassis and the wall.
12Vertical rack-mount posts3
No rear clearance required but the rear must be
open to the hot aisle to exhaust air
13Vertical rack-mount posts for neighboring rack4
Airflow clearance required between the chassis
and inside of cabinet (if a cabinet is used)
14Inside of cabinet (no left side clearance required)5
Chassis depth15Air intake from cold aisle for power supplies6
Cisco Nexus 7000 Series Hardware Installation and Reference Guide
188
Technical Specifications
Cisco Nexus 7004 Chassis Clearances