EasyManua.ls Logo

Cisco Nexus 7004 - Page 202

Cisco Nexus 7004
274 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Right side clearance recommended for open rack
installations:
If next to another open rack, use 6 inches
(15.2 cm) between racks.
If next to a wall, use 11 inches (27.9 cm)
between the chassis and the wall.
10Vertical rack-mount posts3
No rear clearance required but the rear must be
open to the hot aisle to exhaust air
11Vertical rack-mount posts for neighboring racks4
Chassis depth12Air intake from cold aisle for power supplies5
Clearance required between the front of the
chassis and the inside of the cabinet for the cable
management frames and the optional front door
13Air intake from cold aisle for the supervisor and
I/O modules
6
Front clearance required for installing the
chassis and replacing the modules
14Air exhaust to hot aisle for all modules and
power supplies
7
Figure 134: Clearances Required for the Cisco Nexus 7004 in a Two-Post Rack with Center-Mount Brackets
No left side clearance required (no airflow on
left side)
8Cisco Nexus 7004 chassis1
Cisco Nexus 7000 Series Hardware Installation and Reference Guide
190
Technical Specifications
Cisco Nexus 7004 Chassis Clearances

Table of Contents

Related product manuals