EasyManua.ls Logo

Citizen CX 165 - Starting the Balance Up; Conditions of Proper Usage

Citizen CX 165
80 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 7 -
The balance with pipettes calibration set:
- slide chamber side doors off (8)
- inside the chamber put bottom ring
(8),
- put glass ring on bottom ring (7),
- replace pan inside glass ring (6),
- put upper ring on glass ring (5),
- put steam protection container on
upper ring (4),
- put container to pipettes calibration
inside the container (3),
- put glass pad on upper ring (2),
- put glass lid on glass pad (1).
Draw. 1.The components installation for the CX balances
3. START THE BALANCE UP
3.1. Conditions of proper usage
Set the balance on stable table, far from vibrations
The balance should be replaced far from draughts and air breeze.
The balance should be in stable temperature and humidity room
The balance should be replaced far from sources of
Temperature in the room +18° C ÷ +30° C ( AS /X)
If the static electricity has influence on the balance indications it base should be
earthed. Earthing screw is in the rear part of the balance base.
The balance should be replaced in leveled position
Before pipettes calibration and after assembling the set start the balance with
empty pan on (without container). When zeros come up on the display put
the container on the pan and after stabilization press ESC/ZERO TARA.

Related product manuals