CHAPTER 2 Installation
Lifting and Moving the Boiler 2-2
Water Treatment 2-2
Boiler Room 2-4
Gas Piping 2-5
Boiler Waterside Connections 2-10
Electrical Connections 2-11
Wiring Diagrams 2-12
Provisions for combustion and ventilation air must
be in accordance with UL 795, Commercial-
Industrial Gas Heating Equipment, cUL, or
applicable provisions of the local building codes.
Failure to follow this warning could result in
personal injury or death
The boiler must be installed such that the gas
ignition system components are protected from
water (dripping, spraying, rain, etc.) during
appliance operation and service. Failure to follow
this warning could result in equipment failure.
!
Warning
!
Caution
If an external electrical source is utilized, the boiler,
when installed, must be electrically bonded to
ground in accordance with the requirements of the
authority having jurisdiction or, in the absence of
such requirements, with the National Electrical
Code and/or UL 795, Commercial-Industrial Gas
Heating Equipment.
!
Warning

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the CleaverBrooks CBT and is the answer not in the manual?

CleaverBrooks CBT Specifications

General IconGeneral
BrandCleaverBrooks
ModelCBT
CategoryBoiler
LanguageEnglish

Related product manuals