Controls – Installation / Setu
/ Commissionin
UNIT – ADDON REFRIGERATED AIR CONDITIONING
" Unit Foundation correct
" All pipe work is welded and vacuumed down.
" Condenser Coil is purged before charging.
" System is charged, all joints checked and pressures set correctly
" Condenser unit is level
" All clearances around the condenser set to manufacturers specifications.
D
UCTWORK
" All ductwork is completed to plan, correctly supported and airtight, with no bend less than 1.5 x the
ductwork diameter.
" Air distribution checked, dampers are adjusted and all outlets correctly adjusted and wiped clean.
" All roof penetrations are fully sealed and watertight.
" Man hole cover replaced.
S
ITE
" All rubbish has been removed from inside and on the roof.
C
USTOMER HAND OVER
" The operation of the Controller.
" The need to open windows and doors for the correct operation of Fresh Air Conditioning
" The operation of the bleed or dumping system and it’s importance to operate all the time in ducted
evaporative air conditioning
" Maintenance requirements