12 Operating tests
During the commissioning of the machine, we carried out the
following final operation tests. We have tested the correct oper-
ation of the S15 and of its safety systems.
Test description Outcome
Block of the operation in case of release of the se-
lected operation lever.
OK
Basket levelling allowed only when the MEWP aer-
ial part is set in the rest position (pantograph on its
support and boom on its support).
OK
Manual pump for operations in case of emergency.
OK
Outriggers-boom operation interlock. OK
MEWP aerial part operations block when the
MEWP is not stabilized.
OK
Block of the outriggers return/extension when the
aerial part of the MEWP is not set in the rest posi-
tion.
OK
Machine stabilized - signal light. OK
MEWP electrical power supply - signal light. OK
Aerial part consent - signal light OK
Travel consent - signal light. OK
Emergency button in the control stations. OK
Lock valves on cylinders. OK
Max pressure valves for the protection of the whole
hydraulic circuit.
OK
Max pressure valves for the protection of the single
parts of the system.
OK
Electrical system protection fuse OK
Stabilizers extraction - Synchronous control. OK