M0201AJB Era
™
Medium Power Carrier Access Point Installation Guide
© October 2018 CommScope, Inc. Page 51
Installing CAP Ms
Connect the CAP M Power
ConnectthePowerconnectorasappropriateforthisinstallation:
• "ConnecttheMainsPowertotheCAPM”onpage51
• "ConnectaHybridFiberSpliceBox”onpage52.
Connect the Mains Power to the CAP M
1 LocatetheMainspowercablethatwasdeliveredwiththeCAPM.
2 Locateorinstallasuitablepowerjunctionboxorreceptacleneartheunitandroutethepowercablefrom
thepowersourcetotheCAP
M.
3 Dependentonthetypeofpowersupplyusedbytheunit,wirethepowercabletothejunctionboxor
receptacle.Refertothecolorcodeandpinnumbersshownin:
• Figure9onpage50fortheACpowercable
• Figure10onpage50fortheDCpowercable.
4 Withthecable'sMainsplugdisconnectedfromtheCAPM,turnthecircuitbreakeron,unscrewtheplug's
protectivecover,andcarefullytesttheplugwithavoltmetertoensurethatthevoltageandpolarityare
correct.
5 Oncethetestinghasbeencompleted,turnoffthecircuitbreaker.
6 UnscrewtheprotectivecoverfromtheMainsconnectoroftheunit.
Do not connect or disconnect the power cable at the Mains connector while power is on. Turn off Mains
power before connecting the power cable at the unit, then, engage mains power again.
Do not connect the cable to the unit's Mains connector at this time. The power source must be
interruptible.
The Mains cable must be properly secured observing local regulations and electrical codes. Be sure to
allow enough slack in the cable at the CAP M to plug or unplug the cable into the Mains connector.