EasyManua.ls Logo

Conlog BEC62 - Installation Procedures; Installing the Metering Device (MCU)

Conlog BEC62
59 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BEC62(08) technical manual
12
Installing the meter
Installing the metering device (MCU)
Important
Before installing the meter, take note of the following precautions:
The wiring must be performed by a certified installation electrician and must
conform to the prevailing government standards and safety regulations.
This product is not a protection device and so requires the use of a suitable
upstream and downstream breaker.
When wiring the meter, ensure that the incoming supply is isolated by switching off
the upstream breaker.
We recommend that if you are connecting aluminium cables to this product, use bi-
metal lugs.
We recommend that the meter is installed in an enclosure with an IP54 rating or
higher.
For installation of the UIU, see Installing the User Interface Unit (UIU) section, or
refer to the installation guide shipped with the device.
Cabling specification
Cable
Size
Live and Neutral
Maximum 25mm
2
Communication
Maximum 0.7mm
2
Single core recommended
Tools and accessories required for the wall mounting installation
1 x 6mm insulated terminal screwdriver
1 x Insulated side cutters
1 x Electric drill
1 x Masonry drill bit - Ø7mm
3 x wall plugs and screws - Ø7mm x 30mm
8 x bi-metal lugs if aluminium cables are used

Table of Contents

Related product manuals