EasyManuals Logo

DAF CF75 Series Service Manual

DAF CF75 Series
352 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #310 background imageLoading...
Page #310 background image
XE ENGINE INLET/EXHAUST SYSTEM
3-2
©
200324
Inspection and adjustment
9
CF65/75/85 series
4
3.2 CHECKING EXHAUST GAS BACK PRESSURE
Checking exhaust gas back pressure
1. Remove the plug from the exhaust bracket
and install a suitable coupling with a pipe.
The first part of the pipe must be made of
metal, to withstand the high temperatures.
2. Connect a pressure gauge to the pipe, with a
range of at least 0.1 - 0.2 bar (10 - 20 kPa).
Note:
Use an attenuated gauge to prevent
excessive shaking of the gauge needle.
The engine brake must not be used during
measurements.
This is to protect the pressure gauge.
3. Measure the exhaust gas back pressure at
full-load engine speed and compare the
measurement to the specified value; see
"Technical data".
i 400180
https://www.truck-manuals.net/

Table of Contents

Other manuals for DAF CF75 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the DAF CF75 Series and is the answer not in the manual?

DAF CF75 Series Specifications

General IconGeneral
BrandDAF
ModelCF75 Series
CategoryTrucks
LanguageEnglish

Related product manuals