Table 11.7 Shore connection breaker (SCB) open flowchart
Yes
SCB
action
open command
Open
conditions
OK
No
Yes
De-load
shore
connection
Breaker
open
set point
No
Yes
De-load
timer
expired
No
Open SCB
SCB opened
No
Yes
SCB opened
Alarm
Info message
Alarm
Yes
SCB open
command
SCB action
open without
de-loading
command
Breaker
action
Open without
de-loading
Operator
select
Open
Operator
selection
Open without
de-loading
Cancel
Open
End
Open
conditions
OK
No
Yes
Info message
1. SCB open command: The shore connection breaker (SCB) open command can come from the following:
The operator can press the push-button Open breaker on the display unit. If Operator select is selected under Breaker
action, then the operator must also select Open from the information pop-up.
The operator can use PICUS to send an open breaker command. If Operator select is selected under Breaker action, then
the operator must also select Open from the information pop-up.
The command SCB action open is activated by digital input or from an external source. If Operator select is selected under
Breaker action, then the operator must also select Open from the information pop-up.
DESIGNER'S HANDBOOK 4189340911K UK Page 384 of 521