DS2460Q QAM Analysis Meter Operation Manual
2
test should be performed under laboratory condition
whereby the ambient temperature or relative
humidity can be controlled.
Warm up: Allow up to at least 5 minutes warm-up
before performing calibration to the meter. After
exposure or storage in a high humidity (condensing)
environment, relative recovery period is required
essentially.