ICS-1000 Ion Chromatography System
3-22 Doc. 031879-01 3/03
Every Six Months
• Calibrate the cell (see Section 5.1.2).
• Calibrate the vacuum degas assembly (see Section 5.1.4).
• Replace the pump piston rinse seals and piston seals (see Section 5.6).
Yearly
• Rebuild the injection valve (see Section 5.4).
• Replace the AS40 Automated Sampler tip and tubing. The AS40/ASM
Maintenance Kit (P/N 055647) contains all of the components required to
replace the sampling tip and the tubing between the tip and the injection
valve. Instructions are included with the kit.
• Perform the AS50 preventive maintenance procedure. The AS50 Maintenance
Kit (P/N 060581) contains all of the required components and instructions for
performing the procedure.