EasyManuals Logo
Home>DirecTV>Measuring Instruments>Advanced Installation Meter

DirecTV Advanced Installation Meter User Manual

DirecTV Advanced Installation Meter
92 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #64 background imageLoading...
Page #64 background image
6 Performing Other Network Tests AIM User’s Manual
57
Performing a SWiM LF Power Test
You can use the AIM’s SWiM LF Power test feature to determine whether there is a
communications problem between the SWiM and the IRD. To perform this test,
disconnect all IRDs in the distribution network, then connect the AIM in place of an
IRD. The AIM determines whether the SWiM LF Power level is sufficient.
To perform a SW iM L F Powe r tes t:
1 Start the job for the installation (“Starting a Job” on page31).
2 From the HOME screen, press TEST to go to the TEST screen.
3 Use c or d to highlight SWiM LF Power Test and press SELECT to go to the
SWiM LF POWER TEST screen.
4 Disconnect all IRDs in the distribution network. Then connect the AIM in place of
an IRD.
5 Press NEXT and wait briefly for the results of the test.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the DirecTV Advanced Installation Meter and is the answer not in the manual?

DirecTV Advanced Installation Meter Specifications

General IconGeneral
BrandDirecTV
ModelAdvanced Installation Meter
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals