EasyManua.ls Logo

DirecTV Advanced Installation Meter User Manual

DirecTV Advanced Installation Meter
92 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Advanced Installation Meter
Users Manual
© 2010 Rev B

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the DirecTV Advanced Installation Meter and is the answer not in the manual?

DirecTV Advanced Installation Meter Specifications

General IconGeneral
BrandDirecTV
ModelAdvanced Installation Meter
CategoryMeasuring Instruments
LanguageEnglish

Summary

Getting Started

Manual Overview

Introduction to the AIM and guidance on using this manual.

Meter Features and Operation

Details on the AIM's display, buttons, navigation, powering, and battery.

Support and Safety Information

How to get technical support and essential safety precautions.

Technical Details and Parts

Technical specifications, operating parameters, and spare parts list.

Setting Up the Meter

Entering Registration Information

Procedure for inputting user identification and company details into the meter.

Adjusting Display Settings

Adjusting display contrast and brightness for optimal screen visibility.

Configuring Time, Date, and Timers

Setting the meter's clock, date, and automatic power-saving timers.

Changing Volume Setting

How to adjust the audio volume and key beep settings on the AIM.

Setting Up a Job

Starting a Job

Initiate a job by entering the account number for the installation.

Adding Job Notes

Add optional notes for job details, like installation room.

Selecting ODU Type

Choose the correct ODU type for the installation setup.

Selecting Switch Type

Specify the type of switch used in the installation.

Entering Zip Code

Input the zip code to determine satellite coordinates.

Installing an ODU

Aligning the ODU

Step-by-step process to align the Out-Door Unit for optimal signal reception.

ODU Installation Setup Tasks

Performing initial setup steps for ODU installation, including adjustments.

Performing EIV After Installation

Conducting Extended Installation Verification (EIV) post-ODU alignment.

Performing EIV

Selecting EIV Configuration

Choosing the correct equipment configuration for the EIV test.

Selecting Measurement Location

Defining where in the distribution network the EIV test will be performed.

Running EIV Test

Executing the Extended Installation Verification test and obtaining results.

Performing Other Network Tests

In-Line Test

Testing connection segments to locate problems by measuring voltage, current, and signals.

Satellite Tune Test

Tuning to DIRECTV transponders to diagnose connection issues in the distribution network.

SWIM LF Power Test

Verifying sufficient SWIM LF power level for communication between SWIM and IRD.

Cable Resistance Test

Determining cable resistance to identify shorts or breaks in the distribution network.

Transponder Survey

Recording signal power and quality for all transponders to diagnose installation problems.

Managing Records

Understanding Record Types

Overview of different record types stored by the AIM (account, setup, user, test, data).

Viewing Records

How to access and review stored job and test records on the AIM.

Deleting Records

Procedures for removing unwanted log, survey, or account records from the AIM.

Transferring Records

Moving records to and from a USB flash drive for data management.

Updating the Meter

Updating Firmware

Process for updating the AIM's application, database, or both using a USB drive.

Glossary

ODU

Out-Door Unit, referring to the satellite equipment placed outside.

EIV

Extended Installation Verification, an automated process for confirming ODU alignment.

SWIM

Single-Wire Multiswitch technology for distributing signals on one cable.

Transponder

Satellite component that receives and retransmits microwave signals.

Related product manuals