JT40/JT40 All Terrain Operators Manual Prepare - 93
Plan Bore Path
Bend Radius
JT40 Power Pipe
®
HD drill pipes have a tested
minimum bend radius of 146’ (44.5 m). This means
that a 90-degree bend in the bore path:
has a radius (A) of 146’ (44.5 m)
requires approximately 229’ (69.8 m) of drill pipe
(B).
JT40 HIWS1 drill pipes have a tested minimum bend
radius of 145’ (44.2 m). This means that a 90-degree
bend in the bore path:
has a radius (A) of 145’ (44.2 m)
requires approximately 228’ (69.5 m) of drill pipe
(B).
AT
JT40 All Terrain drill pipes have a tested minimum bend radius of 170’ (51.8 m). This means that a 90-
degree bend in the bore path:
has a radius (A) of 170’ (51.8 m)
requires approximately 267’ (81.4 m) of drill pipe (B).
NOTICE: Bending drill pipe more sharply than recommended will damage the pipe and cause failure
over time.
If bend radius is reduced, drill pipe life is reduced.
If bend radius is increased, drill pipe life is increased.
IMPORTANT: Use the charts on the next page to keep bends within safe limits.