EasyManuals Logo

Doosan D35C-9 User Manual

Doosan D35C-9
184 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #117 background imageLoading...
Page #117 background image
Operation Section
-114-
Storage Information
Before Storage
Before storing your lift truck, clean and inspect as the
following procedures.
Wipe away grease, oil, etc. adhering to the
body of the truck with waste cloth, and use
water, if needed.
While cleaning the truck, check general
condition of the truck. Especially check the
truck body for dents or damage and tires for
wear or nails or stones in the tread.
Fill the fuel tank with fuel specified.
Check for leakage of hydraulic oil, engine oil,
fuel, or coolant, etc.
Apply grease, where needed.
Check for looseness of nuts and bolts,
especially hub nuts.
Check mast rollers to see that they rotate
smoothly.
Prime the oil into the lift cylinders by actuating
the lift lever all the way several times.
Drain off coolant completely in cold weather, if
antifreeze is not used.
Long Time Storage
Perform the following service and checks in addition
to the “Parking the lift truck” services.
Taking the rainy season into consideration,
park the machine at a higher and hard ground.
Avoid parking on soft grounds such as an
asphalt ground in summer.
Dismount the battery from the machine. Even
though the machine is parked indoors, if the
place is hot or humid, the battery should be
kept in a dry, cool place. Charge the battery
once a month.
Apply antirust to the exposed parts which tend
to rust.
Cover components such as the breather and
air cleaner which may be caught with humidity.
The machine should be operated at least once
a week. Fill the cooling system, if cooling
water is discharged, and mount the battery.
Start the engine and warm up thoroughly.
Move the machine a little forwards and
backwards. Operate the hydraulic controls
several times.
To Operate the Lift Truck after a
Long Time Storage
Remove covers and antirust from each of the
components and exposed parts.
Drain the engine crankcase, transmission
(clutch type machine), differential and final
reduction gear, clean the inside of them and
add new oil.
Drain off foreign matter and water from the
hydraulic oil tank and fuel tank.
Remove the head cover from the engine
cylinder. Oil valves and rocker shaft and check
each valve for proper operation.
Add cooling water to the specified level.
Charge the battery and mount it on the
machine. Connect the cables.
Perform pre - operational checks carefully.
(refer to “Before Starting the Engine”)
Warm up the machine.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Doosan D35C-9 and is the answer not in the manual?

Doosan D35C-9 Specifications

General IconGeneral
BrandDoosan
ModelD35C-9
CategoryForklifts
LanguageEnglish

Related product manuals