EasyManua.ls Logo

Dover ProGauge MagLink LX Plus - 9.3 Riser, Manhole, and Junction Box Installation

Dover ProGauge MagLink LX Plus
100 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6.1.8.1 Map Dispensers and Nozzles to Tanks
1. Select a Dispenser.
2. Map each Nozzle to a Tank.
3. The offset is the "meter drift" value of the dispenser (the meter drift is set during a pump calibration).
4. Use the slider button to Enable the Nozzle to Tank mapping.
IMPORTANT: Nozzle-to-tank mapping must be done correctly or the console will
communicate incorrect sales data for the tanks and the autocalibration / reconciliation function
will not operate correctly.
NOTE: When manifolded tanks are in use, the first tank in the Manifold Group should be
mapped to the related nozzles. The reconciliation reports and the delivery reports for the full
manifold Group will be shown under the 1st tank.
Autocalibration cannot be performed in a tank that is part of a Manifold Group.
Click the Save Mapping button at the bottom of the panel to save the configuration.
6.1.9 IFSF
This is not in use at this time. Ignore this section. For IFSF connections, the external IFSF module must be
used.
M2051_r4 MagLink LX 4 and LX Plus Configuration Manual | Dover Fueling Solutions 30

Other manuals for Dover ProGauge MagLink LX Plus

Related product manuals