EasyManua.ls Logo

Duke E SERIES - Fan Switch; LIGHT Switch; Fuse and Fuse Holder Light; Buzzer

Duke E SERIES
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13
Service Manual for Electric Convection Oven
6/13 & 5/9 V CONTROLLER ASSEMBLY
& “E”SERIES-ELECTRO MECHANICAL
CONTROLLER ASSEMBLY
WARNING: DISCONNECT OVEN FROM POWER
SOURCE BEFORE PERFORMING
ANY SERVICE.
Component Access Procedure
Remove screw at top center of Control Panel assembly
and slide Control Panel assembly out to allow access
to Control Panel components.
POWER Switch
1. Perform Component Access Procedure.
2. Loosen set screws and remove knob from POWER
Switch.
3. Tag and disconnect wires from POWER Switch.
4. Remove nut securing POWER Switch and remove
POWER Switch.
5. Reverse procedure to install POWER Switch.
TEMPERATURE Control
Refer to THERMOSTAT in this section.
1 - Hour TIMER
1. Perform Component Access Procedure.
2. Loosen set screw and remove 1 - Hour TIMER.
3. Remove nut securing 1 - Hour TIMER and remove
timer.
4. Reverse procedure to install 1 - Hour TIMER.
OVEN READY Light
1. Perform Component Access Procedure.
2. Tag and disconnect wires to OVEN READY Light.
3. Remove OVEN READY Light from front of Control
Panel.
4. Reverse procedure to install OVEN READY Light.
Fan Switch
1. Perform Component Access Procedure.
2. Tag and disconnect wires from Fan Switch.
3. Remove Fan Switch from front of Control Panel.
4. Reverse procedure to install Fan Switch.
LIGHT Switch
NOTE: LIGHT Switch is only on the 6/13 Oven.
1. Perform Component Access Procedure.
2. Tag and disconnect wires from LIGHT Switch.
3. Remove LIGHT Switch from front of Control Panel.
4. Reverse procedure to install LIGHT Switch.
Fuse and Fuse Holder Light
1. Remove Fuse Holder Cap to replace Fuse.
2. Perform Component Access Procedure.
3. Tag and disconnect wires to Fuse Holder.
4. Remove nut securing Fuse Holder.
5. Remove Fuse Holder from front of Control Panel.
6. Reverse procedure to install Fuse Holder.
Buzzer
1. Perform Component Access Procedure.
2. Tag and disconnect wires from Buzzer.
3. Remove screw securing Buzzer to back of Control
Panel and remove Buzzer.
4. Reverse procedure to install Buzzer.
Power
Switch
Buzzer
1-Hour
Timer
Knob
Oven
Ready
Light
2-speed
Fan
Switch
Fuse Holder & Fuse
(10 amp delay)
Thermostat
Interior Light
Switch
Mylar,
Electric
Cook/Timer
Control Panel
6
/
13
Screw

Table of Contents

Other manuals for Duke E SERIES

Related product manuals