EasyManua.ls Logo

Eaton 93PM - Page 51

Eaton 93PM
126 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3. For 30-50 kW frame: Remove
the screw securing the MBS
protection cover on bottom left
of the front panel.
4. Loosen the screw in the middle
of the know and pull the knob
off the shaft.
5. Remove the screws and pull out
the safety shield panel in front
of the connectors.
6. For 80-150 kW frame: Remove
the screws and pull out the
safety shield panel in front of
the connectors.
Eaton 93PM UPS 30–200 kVA User's and installation guide
©
Eaton Corporation plc 2017. All rights reserved. Revision: 005 Document ID: P-164000249 51 (126)

Table of Contents

Other manuals for Eaton 93PM

Related product manuals