10. You can test the relays by selecting any of the options in the test mode
(see Figure
41
).
Figure 43. Relays
1
Cable exit opening for up to 12 mm (½”)
conduit
3 K1 thru K5 terminal connections for relay
contacts to operator's monitoring
equipment
2 Signal input connector with voltage supply
Eaton 93PM UPS 30–200 kVA User's and installation guide
©
Eaton Corporation plc 2017. All rights reserved. Revision: 005 Document ID: P-164000249 87 (126)