UPS System Installation
4-14 Eaton 93PM UPS (20–100 kW, 480V – 100 kW Frame) Installation and Operation Manual P-164000227—Rev 6 www.eaton.com/powerquality
15. If wiring battery detect connections, proceed to paragraph 4.11.2; if wiring battery shunt trip connections,
proceed to paragraph 4.11.3; if wiring generator interface connections, proceed to paragraph 4.11.4; if
wiring external parallel CAN connections, proceed to paragraph 4.11.5; if wiring external parallel pull chain
connections, proceed to paragraph 4.11.6; if wiring Minislot connections, proceed to paragraph 4.11.7; if
wiring REPO connections, proceed to paragraph 4.12; otherwise, proceed to Step 16.
16. Close the UPS outside door and secure the latch.
Figure 4-9. Interface Terminal Locations
Front
Interface Terminals
(See Figure 4-10 for detail.)
Minislot
Communication Bays
(See Figure 4-10 for detail.)
Pull Chain and CAN Terminals
(See Figure 4-10 for detail.)