UPS System Installation
Eaton 93PM UPS (20–100 kW, 480V – 100 kW Frame) Installation and Operation Manual P-164000227—Rev 6 www.eaton.com/powerquality 4-15
Figure 4-10. Interface Terminal Detail
Figure 4-11. Bottom Access Interface Wiring Location
Pull Chain Terminals
Minislot Communication Bay 2
Minislot Communication Bay 1
Minislot Communication Bay 3
Minislot Communication Bay 4
Building Alarm Terminals
(See Figure 4-13 for
terminal assignments.)
Pull Chain and
CAN Terminals
Device USB
RS-232
Host USB
REPO Terminals
(See Figure 4-22 for
terminal assignments.)
Relay Output Terminals
(See Figure 4-14 for
terminal assignments.)
Cabinet Stiffener Bar
Bottom Entry Conduit Landings
for Customer Interface Wiring
Wire Tie Anchors
(See Figure 4-12 for detail.)
Bottom Access Interface
Wiring Channel