UPS System Installation
Eaton 93PM UPS (20–100 kW, 480V – 100 kW Frame) Installation and Operation Manual P-164000227—Rev 6 www.eaton.com/powerquality 4-21
Figure 4-16. Battery Shunt Trip Terminal Detail
Figure 4-17. Battery Shunt Trip Terminal Assignments
Shunt Trip Terminals
(See Figure 4-17 for
terminal assignments.)
Table 4-3. Battery Shunt Trip Connections and Wire Terminations
Terminal Name Description
Recommended
Minimum Wire Size
Size of Pressure
Termination
Tightening Torque
1 48 Vdc Battery Shunt Trip +
Output: Contacts used to open battery breaker or
disconnect
Twisted Pair Wires
#18 AWG
#1430 AWG
2lbin
(0.22-0.25 Nm)
2 48 Vdc Battery Shunt Trip –
3 Not Used
4 Not Used
Battery Shunt Trip +
Battery Shunt Trip –
Not Used
Not Used
UPS
Shunt Trip
Terminals
1
2
3
4