EasyManua.ls Logo

Eaton 93PM - Table 4-4. External Parallel CAN and Pull Chain Connections; Table 4-5. External Parallel CAN and Pull Chain Terminal Block Terminations

Eaton 93PM
158 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
UPS System Installation
4-24 Eaton 93PM UPS (20–100 kW, 480V – 100 kW Frame) Installation and Operation Manual P-164000227—Rev 6 www.eaton.com/powerquality
Table 4-4. External Parallel CAN and Pull Chain Connections
External Parallel Terminal Block Name Description
1 Pull Chain
External parallel pull chain connections between UPSs.
2 Pull Chain Ground
3 CAN H In
External parallel CAN input connections from previous UPS.4CAN L In
5 Ground
6 Earth Not Used
7 CAN H Out
External parallel CAN output connections to next UPS.8 CAN L Out
9 Ground
10 Earth Not Used
Table 4-5. External Parallel CAN and Pull Chain Terminal Block Terminations
Terminal Function
Recommended
Minimum Wire Size
Size of Pressure
Termination
Tightening Torque
Nm (lb in)
Type Screw Comments
CAN
#18 AWG
#26–#16 0.4 (3.5) - 0.8 (7.1) Slotted Use shielded twisted-pair wires with drain wire for
each input and return or common.
Strip wire insulation
back 10 millimeters to wire terminal blocks.
Pull Chain #26–#16 0.4 (3.5) - 0.8 (7.1) Slotted Use twisted-pair wires for each input and return or
common.
Strip wire insulation back 10 millimeters to
wire terminal blocks.

Table of Contents

Other manuals for Eaton 93PM

Related product manuals