8. Secure the UPS cabinet in position by lowering the leveling feet until the cabinet is not resting on the
casters and the cabinet is level.
9. If permanently mounting the system, proceed to Step 11;
10. Using the retained hardware, reinstall the shipping brackets removed in Step 2 and Step 5 to the front
and rear of the UPS cabinet with the angle facing outward (see Figure 3-4 and Figure3-5).
11. Secure the cabinet to the floor with customer-supplied hardware.
NOTE
Ifthecabinetisremovedfromitsoriginalinstallationlocationandtransferredtoanewlocationonthepallet,the
levelingfeetmustbelowereduntilthecabinetisnotrestingonthecasters.Inaddition,theshippingbrackets
must be attached to the cabinet and pallet.