EasyManuals Logo

Eaton 93PR Series User And Installation Guide

Eaton 93PR Series
98 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #41 background imageLoading...
Page #41 background image
25-75 kW
User's and Installation Guide
32
8. Secure the UPS cabinet in position by lowering the leveling feet until the cabinet is not resting on the
casters and the cabinet is level.
9. If permanently mounting the system, proceed to Step 11;
10. Using the retained hardware, reinstall the shipping brackets removed in Step 2 and Step 5 to the front
and rear of the UPS cabinet with the angle facing outward (see Figure 3-4 and Figure3-5).
11. Secure the cabinet to the floor with customer-supplied hardware.
NOTE
Ifthecabinetisremovedfromitsoriginalinstallationlocationandtransferredtoanewlocationonthepallet,the
levelingfeetmustbelowereduntilthecabinetisnotrestingonthecasters.Inaddition,theshippingbrackets
must be attached to the cabinet and pallet.

Table of Contents

Other manuals for Eaton 93PR Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Eaton 93PR Series and is the answer not in the manual?

Eaton 93PR Series Specifications

General IconGeneral
BrandEaton
Model93PR Series
CategoryUPS
LanguageEnglish

Related product manuals