EasyManuals Logo

Eaton 93PR Series User And Installation Guide

Eaton 93PR Series
98 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #86 background imageLoading...
Page #86 background image
25-75 kW
User's and Installation Guide
77
7.2.4 ANNUAL M aintenance
Annual preventive maintenance should be performed only by authorized service personnel familiar with
maintenance and servicing of the UPS system. Contact your service representative for more information
about service offerings.
7.2.5 BATTERY Maintenance
Contact your service representative for battery maintenance. Battery replacement and maintenance should
be performed only by authorized service personnel.
7.3 Recycling the Used UPS or Batteries
Before scrapping UPS or its battery cabinet, the battery bank must be removed. Local requirements must be
followed in battery recycling or discard. The removal of batteries is allowed only by authorized service
personnel due to high energy and voltage.
Do not discard waste electrical or electronic equipment in the trash. For proper disposal, contact your local
collecting/recycling/reuse or hazardous waste center and follow the local legislation.
These symbols indicate on a product:
Figure 7-1: WEEE Symbol
Use proper local collecting centers meeting local legislation when handling waste of electrical and electronic
equipment.

Table of Contents

Other manuals for Eaton 93PR Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Eaton 93PR Series and is the answer not in the manual?

Eaton 93PR Series Specifications

General IconGeneral
BrandEaton
Model93PR Series
CategoryUPS
LanguageEnglish

Related product manuals