EasyManua.ls Logo

Eaton ePDU G3 - Installing the Horizontal Models in a Rack Cabinet

Eaton ePDU G3
148 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
Eaton ePDU G3 Operation Manual P-164000277—Rev 5 26
Figure 23. Single Rearward
4. Remove the existing screws in the holes where you want to position the bracket in the U-Channel rail.
5. Align the bracket screw holes with the U-Channel screw holes and secure the bracket (with clip feet
installed) to the rack rail with the U-Channel screws.
6. Repeat for the second bracket.
7. Snap the ePDU into the mounting clip feet. When you hear a clicking sound for each mounting clip foot,
the ePDU is secure.
8. Continue to “Grounding the ePDU” on page 28 if you are installing a ground screw and grounding cable.
Otherwise, go to “Network and Environmental Ports” on page 29.
Installing the Horizontal Models in a Rack Cabinet
10-32 Screw
8-32 Screw
keps Nut
keps Nut
Mount the ePDU on the front of the clip foot.
NOTE: The outlets will be facing out the back of the ePDU.
Back of
Bracket
NOTE For horizontal installations in square-hole racks, a cage nut must be installed in the
selected mounting holes.

Table of Contents

Other manuals for Eaton ePDU G3

Related product manuals