Instruction Manual PMC-2
BA * PMC-2 * EN * 01/98 Page 57
End of 1st commissioning
Lay of mains supply
First the emergency stop should be actuated.
If all status displays are o.k., release the emergency stop.
Positioning of axis
For the first positioning of the axis choose "Manual operation slow"
• Caution! Check sense of rotation of axis.
• Check the software limit switch
• Brake distance check
Check of the hardware emergency stop limit switch.
The brake distance is checked in both directions.
After successful 1st commissioning of the PMC-2, lay now the mains supply.