EasyManuals Logo

elco VGL 06.2100 DP User Manual

elco VGL 06.2100 DP
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #47 background imageLoading...
Page #47 background image
47
06/2011 - Art. Nr. 13 018 118C
Burner and boiler servicing can
only carried out by a trained
specialist. The system operator
is advised to take out a service
contract to guarantee regular
servicing.
Monitoring the flue gas temperature
Check the exhaust gas temperature.
Clean the boiler if the exhaust gas
temperature is over 30°C above the
start-up value.
Maintenance
Checking the ignition electrodes
and the mixing unit.
Undo safety screw D.
Remove mobile axis E.
Open the burner housing.
Undo the ignition cable.
Undo the four screws of the settings
board (RTC) by 2 turns.
Undo pressure screw C.
Remove the mixer unit.
Check and adjust the position of the
ignition electrodes and the turbulator.
Refit in the reverse sequence.
Check the condition and position of
the O-ring seal J1 when assembling.
Check for leaks.
Cleaning the fan
Disconnect the motor by unplugging
it from the power supply.
Unscrew the 7 screws of the motor panel.
Remove the panel and motor, taking
care not to damage the gas pressure
tube of the air pressure switch.
“Dry” clean the air pressure pipes.
Do not use pressurised materials.
Thoroughly clean the air duct and fan.
Reassemble.
EN

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the elco VGL 06.2100 DP and is the answer not in the manual?

elco VGL 06.2100 DP Specifications

General IconGeneral
Brandelco
ModelVGL 06.2100 DP
CategoryBurner
LanguageEnglish

Related product manuals