32
04 DOORS & WINDOWS
LIFT TERMINOLOGY
DEPLOY (A-C)
A. UNFOLD (Out) - Platform Unfolds:
Unfold is the action of the platform
rotating out and down from the fully-
stowed (vertical) position to floor level
(horizontal) position when the UNFOLD
switch is pressed.
B. DOWN - Platform Lower:
Down is the action of the platform
lowering from floor level position to
fully-lowered (ground level) position
when the DOWN switch is pressed.
C. DOWN - Outer Barrier Unfold
(Deploy): When the platform reaches
the fully-lowered (ground) position
and the DOWN switch is continued to
be pressed, the outer barrier rotates
downward from vertical position to
ramp position.
STOW (D-F)
D. UP - Outer Barrier Fold (Raise):
When the lift is fully lowered and the
outer barrier is in the ramp position,
pressing the UP switch first rotates
the outer barrier upward from ramp
position to vertical position.
E. UP - Platform Raise: Up is the
action of the platform raising from
ground level to floor level (fully-raised)
position when the UP switch is pressed.
F. FOLD (In) - Platform Fold:
Fold is the action of the platform
rotating up and in from the floor level
(horizontal) position to fully- stowed
(vertical) position when the FOLD
switch is pressed.
STOWED POSITION: The lift is stowed
when the lift platform has been
fully raised and folded fully (vertical
position).
FLOOR LEVEL: Floor level is the
position (height) the platform assembly
reaches in order for the wheelchair
passenger to enter and exit the
vehicle (fully raised). The platform
automatically stops at floor level when
unfolding from the stowed position and
when raising from ground level.
PARATRANSIT OPERATION
Due to proprietary consideration
and variances between lift models,
information presented in this section of
the manual is limited, and generalized.
Refer to the Lift Operator’s Manual for
more specific information.
i IMPORTANT
READ MANUAL AND SUPPLEMENT(S)
BEFORE OPERATING LIFT.
READ AND BECOME FAMILIAR
WITH ALL SAFETY PRECAUTIONS,
OPERATION NOTES AND DETAILS,
OPERATING INSTRUCTIONS AND
MANUAL OPERATING INSTRUCTIONS
BEFORE OPERATING THE LIFT.
LOAD AND UNLOAD ON LEVEL
SURFACE ONLY.
ENGAGE VEHICLE PARKING BRAKE
BEFORE OPERATING LIFT.
PROVIDE ADEQUATE CLEARANCE
OUTSIDE THE VEHICLE TO
ACCOMMODATE THE LIFT BEFORE
OPENING LIFT DOOR(S) OR
OPERATING LIFT.
INSPECT LIFT BEFORE OPERATION. DO
NOT OPERATE LIFT IF YOU SUSPECT
LIFT DAMAGE, WEAR OR ANY
ABNORMAL CONDITION.
KEEP OPERATOR AND BYSTANDERS
CLEAR OF AREA IN WHICH THE LIFT
OPERATES.