35
CHAPTER 4 —
NECESSARY ELNet LT SETTINGS
In this chapter you will find instructions to set the minimum
settings that are necessary to allow the ELNet LT
Energy &
Powermeter
to function properly.
• The selection, installation and settings of the
Current Transformer are the most vital and
fundamental actions required to ensure the
accuracy of the
ELNet LT
Energy
Powermeter.
• It is essential to know the ratio of the Current
Transformer being installed into the system in
order to set the parameter for the Current
Transformer correctly.
• All three main current Lines MUST have
Current Transformers of the same ratio installed
onto them.
WARNING!