EasyManuals Logo

ELTRA CS-2000 Manual

ELTRA CS-2000
110 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #21 background imageLoading...
Page #21 background image
Installation
21
Normal operation temperature for the resistance furnace is 1350°C.
4.7 Gas purification furnance connecting (optional)
CAUTION
C4.0076
Scalding/burns
Hot furnace / combustion tube / analyzer parts
Parts of the analyzer can be very hot.
Use heat protecting gloves.
Fig.
9
: the gas purification furnace
The tube from the pressure regulator is connected to the lower fitting of the gas purification
furnace (optional), and the tube (1) is connected on its place. See above diagram.
1

Table of Contents

Other manuals for ELTRA CS-2000

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ELTRA CS-2000 and is the answer not in the manual?

ELTRA CS-2000 Specifications

General IconGeneral
BrandELTRA
ModelCS-2000
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals