3.2.3 Pipework requirements
Good engineering practice should be followed at all times:
Correct preparation, welding and finishing techniques
Correctly sized gaskets
Correctly aligned flanges and gaskets
Connecting pipe work should match the internal diameter of the flowmeter.
Maximum pipe diameter mismatch should not exceed:
1 mm (0.04 inch) for diameters < DN 200 (8")
3 mm (0.12 inch) for diameters DN 200 (8")
For further information please refer to ISO 14511.
"
Caution!
New installations should be free of metallic and abrasive particles to prevent damage to the sensing
elements on start-up.
a0005103
Correctly aligned flanges and gaskets
a0005104 a0005105 a0005106
Pipe diameter one is not equal pipe
diameter two
Incorrectly sized gaskets Incorrectly aligned flanges and gaskets