EasyManua.ls Logo

Enviro C60I - Placement and Framing

Enviro C60I
55 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
21
Table 2. Framing Dimensions.
Minimum Framing Dimensions
Depth 20” 508mm
Width 71” 1803mm
Header Height 38” 965mm
Enclosure Ceiling 72” 1829mm
The location for the replace can be raised, at oor level, or installed in a corner. There are specic framing
measurements for each situation. The basic rough opening should have the dimensions shown in Figure 27.
The replace must have a strong and level surface to be placed on. The surface should be made of wood or
another robust, non-combustible material.
The gas line should be run to the right side of the replace, there is a 3/8 Male NPT tting to connect the
gas line to. The electrical wiring should be brought to the left side if needed. The location of the replace
should be chosen so there will be at least 36 inches (91.4 cm) from drapes, doors and other combustibles.
Figure 27. Construction Framing Dimensions
Initial Installation
QUALIFIED INSTALLERS ONLY
pLacement anD FRaming:
72”
(1829mm)
20”
(508mm)
38”
(965mm)
71”
(1803mm)
STEEL STUD
1(25mm)
Clearance from
framing studs
to venting

Related product manuals