FIRST START-UP
CARD G / FIT 21 V 6.15 E / April 2010
To stop the hopper loader, press again.
Note: The FIT-controller contains a weekly timer to start loading material before the drying
process starts. The drying process has the same or its own weekly timer which automatically
starts the drying process.
Turn the main power switch to the OFF position if the dryer is not going to be used for a longer
period of time.
Contact and/or its representative for any question regarding the start up and the
normal operation if you feel unsure before you resume normal operation.