EasyManua.ls Logo

Festo Compact Performance CP-FB9-E - Page 60

Festo Compact Performance CP-FB9-E
103 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Recommendation
Providing the safety requirements of your machine/sys-
tem are fulfilled, commission the CP system with both
operating voltages (pins 1 and 2), but without com-
pressed air.
In this way, you have the possibility of testing without
the risk of unintentional reactions.
PLEASE NOTE
A CP valve location occupies two addresses.
The following applies:
lower-value address: pilot solenoid 14
higher-value address: pilot solenoid 12
2. Commissioning
CP FB13-E 9904b 2-31

Table of Contents