Page 41CWT S5 Installation & Maintenance ManualIssue 5
Product description
Connector
Com port
Type
Function
J33
SD Card
J34
External Light
J35
Com 3 (*
Internal iMX53 UART
External pay unit or bill reader - Serial 1
J36
Coin detection sensor
J37
Com 3 (*
Internal iMX53 UART
External pay unit or bill reader - MDB
J38
Boot Mode
J39
Fuse Voltage
J40
Not mounted
J41
Colour display with LDVS and Backlight
J42
Battery voltage
Printer power, Flowbird printer
J44
Not mounted
J45
Microphone
J47
JTAG imx53
J48
Not mounted
J49
Not mounted
(* J35 cannot be used if the MDB port (J37) is used and vice versa
(** Only if an expansion board with a serial connector is installed
5
Installation
Flowbird strongly recommend the following conditions and settings to be
considered when planning and installing solar operated CWT S5 terminals.
Deviations from the guidelines will result in lower efficiency from the solar panel
which may lead to operational issues depending on location, configuration,
maintenance and usage frequency.
5.1 Site preparations
Before installing a terminal, you must verify that its location meets the
requirements listed in the following section to secure proper operation.
5.1.1
Minimal site dimensions & Mounting holes
The given distances between fixed objects at the back and the sides of the
terminal are minimum recommended distances:
·
The distance behind the terminal enables easy handling while mounting the
terminal and some vertical adjustment of the terminal. This distance is

Table of Contents