EasyManua.ls Logo

Fluke DTX-GFM2 - Step 5: Saving the Results; Certifying Fiber Cabling; Required Equipment

Fluke DTX-GFM2
320 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DTX Series CableAnalyzer
Technical Reference Handbook
2-12
Step 5: Saving the Results
5-1
Press N.
5-2
Use the text editing screen to enter a name for the
results. See Figure Figure 2-1 on page 2-3 for details on
editing text.
5-3
Press N when you are done.
This concludes the tutorial on testing twisted pair cabling.
For more information on testing twisted pair cabling, see
Chapter 3.
Certifying Fiber Cabling
This section familiarizes you with the optional DTX-MFM2,
DTX-GFM2, and DTX-SFM2 fiber modules by guiding you
through the following tasks:
Installing fiber modules
Checking the battery status and verifying operation
with the fiber modules
Setting a reference in Smart Remote mode
Running an Autotest in Smart Remote mode
Viewing the Autotest results
Saving the results
Required Equipment
Figure 2-7 shows the equipment for testing fiber cabling in
Smart Remote mode.

Table of Contents

Other manuals for Fluke DTX-GFM2

Related product manuals