EasyManua.ls Logo

Fluke DTX-GFM2 - Step 1: Installing the Fiber Modules; Step 2: Checking the Battery Status and Verifying Operation with Fiber Modules

Fluke DTX-GFM2
320 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DTX Series CableAnalyzer
Technical Reference Handbook
2-14
Step 1: Installing the Fiber Modules
1-1
Turn off the tester and smart remote.
1-2
Remove the cover from the back of each unit and install
a DTX-MFM2, DTX-GFM2, or DTX-SFM2 module in each
unit, as shown in Figure 2-8.
amd34af.eps
Figure 2-8. Installing Fiber Modules
WCaution
Leave the module bay covers in place when the
fiber modules are not installed.
Step 2: Checking the Battery Status and Verifying
Operation with Fiber Modules
2-1
Clean the tester’s connectors and the connectors on two
SC/SC reference test cords. See page 7-9 for details on
cleaning.
2-2
Connect the tester and smart remote together, as
shown in Figure 2-9.
2-3
Turn the rotary switch to SPECIAL FUNCTIONS.
2-4
Use D to highlight Battery Status; then press
H. Press I when you are done.
2-5
Use D to highlight Self Test; then press H.
2-6
Press Pto start the self test.

Table of Contents

Other manuals for Fluke DTX-GFM2

Related product manuals