EasyManua.ls Logo

Froling FHG 20 - Installing the Cleaning Port Door and Blank Cover

Froling FHG 20
62 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Boiler Installation
Boiler assembly
Page 28
M1060008_US v
3
Installing the cleaning port door and blank cover
Slide the complete side insulation assembly
towards the rear until the black, perforated L
plates meet the front face of the boiler body.
Recommendation: Install the cleaning port
door on same side as the cleaning lever.
Install the cleaning port door using 3 Allen
screws. Start with the large threaded boss.
Attach the door handle for the cleaning port
door using a round headed screw
Install the blank cover for the side cleaning
port on the required side
When complete, the handle must latch with a
downward motion.

Table of Contents

Related product manuals