Boiler Installation
Boiler Assembly
Froling GmbH, Industriestrasse 12, A-4710 Grieskirchen, Austria Page 33
www.froling.com M1060008_US
Locate the floor insulation
assembly into the U-profiles in the
base of the boiler and slide in fully
On the same side as the brass
bushing:
Remove the pre-punched
perforation from the insulating side
panel
File rough edges using a half-round
file and remove burrs
Place the plastic trim ring on the
cleaning lever.
Position the cleaning lever
Fit the spacer tube (1) and the
heat-exchanger bracket (2)
Slide the cleaning lever fully into
position and secure using clamping
jaws